YEAR | FACILITY | TYPES OF WORK |
2006 | Rosenergoatom Concern | Modernization of the stator winding rods of the ЗИП ТВВ -320-2УЗ; TВВ-1000-2УЗ; TВВ-500-2УЗ in the conditions of the production site in Moscow |
2006 | Tyumenskaya CHP -2 | Comprehensive survey of the turbine generator ТГВ-200-2МУЗ |
2007 | Surgutskaya SDPS -2 | Repair of the stator with the replacement of the stator winding of the turbine generator ТВВ-800-2УЗ |
2007 | Subsidiary of Rosenergoatom Concern Kolskaya NPP | Comprehensive survey, assessment of technical condition and residual life of turbine generators TВВ-220 and TГ-5,6,7,8, generators and exciters of ДГ generators of power units No. 3 and No. 4. Comprehensive survey of diesel generator 15Д100 type 10ДН20,7 / 2х25,4. Complex survey of generators of СГДС type 15-54-8 diesel generating sets of the power units 3,4 |
2007 | Subsidiary of Rosenergoatom Concern Kurskaya NPP | Justification of the residual resource of the exciters of ВГТ -5000-500АУЗ generators of power unit No. 2 with the aim of extending the lifetime of the generator |
2007 | Surgutskaya SDPS -2 | Comprehensive survey of turbine generators ТВВ-800-2ЕУЗ units No. 1.4; vibro-examination of OJSC “OGK-4” of connecting buses of stator windings of turbine generators of blocks 1-6 |
2007 | Subsidiary of Rosenergoatom Concern Kalininskaya NPP | Elaboration of recommendations for the modernization of the standard means of thermal control of the winding of stators of turbine generators of the type TВВ-500-2УЗ and ТВВ-1000-4УЗ; elaboration of recommendations for reducing the vibration levels of turbine generators of the ТВВ-500-2УЗ type |
2008 | Subsidiary of Rosenergoatom Concern Leningradskaya NPP | Comprehensive survey of diesel generators СГД-16-69-6 with exciters ВП-111 of power unit No. 3 |
2008 | Subsidiary of Rosenergoatom Concern Smolenskaya NPP | Survey and evaluation of the residual life of the turbine generator ТВВ-500-2УЗ of the unit No. 1, the working exciters ВТ-500-2УЗ and the reserve exciters ДАЗ-1818-893-ГПС-300-7503 in connection with the extension of the life of the power unit 1 |
2008 | Surgutskaya SDPS -2 | Repair of the rotor of the turbine generator ТВВ-800-2УЗ |
2008 | Surgutskaya SDPS -1 | Inspection of the technical condition of windings of stators and rotors of turbine generators ТВВ-200-2 blocks 1,8,15,16 |
2008 | Subsidiary of Rosenergoatom Concern Leningradskaya NPP | Preparation of materials for increasing the production of electrical equipment. Technical inspection of the electrical equipment, the power delivery scheme to justify the possibility of increasing the load and developing measures to increase the production of electricity |
2008 | Subsidiary of Rosenergoatom Concern Kolskaya NPP | Carrying out of tests for heating of turbine generators ТВВ-220-2АУ3 st.№8 of the power unit №4, st. No. 5 of the power unit No. 3, an examination was also carried out and conclusions on thermal reserves, recommendations on operating conditions were prepared |
2008 | Subsidiary of Rosenergoatom Concern Balakovskaya NPP | Elaboration of a set of proposals for increasing the active power of the turbine generator ТВВ-1000-4 in terms of monitoring the rotor current of the generator (exciter) in systems with brushless excitation; examination of the possibility and limits of participation of nuclear power plant turbine generators in regulating of reactive power and voltage on the switchgear busbar; the elaboration of an automated diagnostic system for the brush-contact apparatus of the turbine generator; working out of design documentation for the implementation of the modernized monitoring system for power transformers |
2008 | Subsidiary of Rosenergoatom Concern Smolenskaya NPP | Survey and evaluation of the residual life of the turbine generator ТВВ-500-2УЗ of the unit No. 1, the working exciters ВТ-500-2УЗ and the reserve exciters ДАЗ-1818-893-ГПС-300-7503 in connection with the extension of the lifetime of the power unit 1 |
2008-2009 | Sormovskaya CHP | Repair of two stators of turbine generators ТВФ-63-2 with replacement of winding |
2009 | Subsidiary of Rosenergoatom Concern Bilibinskaya NPP | Carrying out of technical inspection, estimation of residual life and prolongation of service life of automated diesel-generator stations ДЭС of КАС-500РАУ4 type |
2009 | Subsidiary of Rosenergoatom Concern Leningradskaya NPP | Comprehensive survey of the technical state of the ТВВ-500-2УЗ generators of the fourth power unit with the aim of determining the possibility of extending the remaining resource |
2010-2011 | Surgutskaya SDPS -2 | Modernization of two rotors of the ТВВ-800-2УЗ with replacement of slot and wiring insulation, with an increase in the class of heat resistance, modernization of the main units |
2011 | Surgutskaya SDPS -2 | Diagnosis and assessment of the technical state of the turbine generator ТВВ-800-2EУЗ of Unit No.3 |
2011 | Berezovskaya SDPS | Comprehensive survey and diagnostics of the turbine generator ТВВ-800-2EУЗ of unit No.2 |
2011 | Smolenskaya SDPS | Complex survey of turbine generators ТГВ-200М of blocks № 1, 2 |
2011 | Subsidiary of Rosenergoatom Concern Kalininskaya NPP | Inspection and evaluation of the residual life of the turbine generator ТВВ-500-2УЗ of unit No.1, working exciters ВТ-500-2УЗ and reserve exciters |
2012 | OJSC “E.ON Russia”
“Surgutskaya SDPS-2”
|
Modernization of the rotors of turbine generators ТВВ-800-2ЕУЗ of power units st. № 2,3,5 with the supply of materials |
2013 | Subsidiary of Rosenergoatom Concern Balakovskaya NPP | Conducting ultraviolet survey of the generators of the power unit №№ 3,4 |
2013 | OJSC “NPO CKTI”
|
Instrumental survey of the equipment of OJSC “Pauzhetskaya GeoES” with the aim of extending the service life of the turbine generator ТГУ-3 |
2013 | OJSC “TGC №11” | Survey services for the purpose of assessing the technical condition of damages of the rod of stator winding of the turbine generator st. No. 8 of SDPS-2 for the needs of Tomsk Branch of OJSC “TGC № 11” |
2012-2013 | OJSC “E.ON Russia”
“Surgutskaya SDPS-2”
|
Works on modernization of rotors of turbine generators ТВВ-800-2ЕУЗ of power units st. №№ 2,3,5 \ |
2012-2014 | OJSC “E.ON Russia”
“Surgutskaya SDPS-2”
|
Works on modernization of rotors of turbine generators ТВВ-800-2ЕУЗ of power units st. №№ 2,3,5 of the branch “Surgutskaya SDPS-2” OJSC “E.ON Russia” |
2014 | OJSC “E.ON Russia”
“Surgutskaya SDPS-2”
|
Сomprehensive survey of the state of the winding and the active steel of the stator and the winding of the rotor of the turbine generator ТВВ-800 unit 5 during the repair |
2014 | OJSC “EMiKS” | Technical inspection of the turbine generator 2ГТ “CHP-2” |
2014 | OJSC “NPO CKTI”
|
Participation in the assessment of technical condition and determination of the remaining resource of the hydrogenerator st. № 6 of the ”Irkutsk HPP” |
2014 | “Lukoil – Astrakhanenergo”Ltd | Technical inspection of the turbine generator st. № 3 ТВФ-110-2ЕУЗ |
2014-2015 | Subsidiary of Rosenergoatom Concern Kalininskaya NPP | Estimation of technical condition and residual life of the turbine generator of the power unit No. 2 of Kalininskaya NPP in order to extend the service life |
2015 | Subsidiary of Rosenergoatom Concern Novovoronezhskaya NPP | Conducting a technical condition survey with an assessment of the reliability and residual life of the electrical equipment of the ТВВ-220-2A generators (station numbers Г-9, Г-10) complete with TВС-6-2 (station numbers ГСР-9, ГСР-10) of the power unit No. 3 of Novovoronezhskaya NPP in order to extend the service life |
2015 | OJSC “E.ON Russia”
|
Services for the complex diagnostic examination of the technical condition of the turbine generator ТГ-4 type ТГВ-200 |
2015 | OJSC “E.ON Russia”
“Surgutskaya SDPS-2”
|
Contract on the emergency recovery repair of the backup stator for installation at the power unit st. № 4 (replacement of the rod) with the supply of materials |
2015 | “Group of Companies Energotechservis” Ltd | Inspection of the technical condition of samples of power and control cables of a stand-alone repository of the spent (ОСХОТ) power unit No. 5 of Novovoronezhskaya NPP in order to determine the additional life of cables |
2015 | Subsidiary of Rosenergoatom Concern Novovoronezhskaya NPP | Conducting a technical condition survey with an assessment of the reliability and residual life of the electrical equipment of the ТВВ-220-2A generators (station numbers Г-9, Г-10) complete with ТСБ-6-2 (station numbers ГСР-9, ГСР-10) of the power unit No. 3 in order to extend the service life |
2015 | “Lukoil – Astrakhanenergo”Ltd | Technical inspection of the turbine generator st. № 2 ТВФ-110-2ЕУЗ |
2015 | Subsidiary of Rosenergoatom Concern Leningradskaya NPP | Services for inspection, assessment of technical condition and confirmation of the resource characteristics of DC boards (1 ЩПТ, 2ЩПТ), open switchgear-750 kV and switchgear-0.4 kV (section 613-1ННБ, 613-2ННБ, 690-1НО, 690-2НО) of the power unit No. 3 |
2016 | OJSC “E.ON Russia”
“Berezovskaya SDPS” |
Comprehensive survey of the turbine generator ТВВ-800-2ЕУЗ st. №ТГ-1 |
2016 | PJSC “The Second Generating Company of wholesale electricity market” | Services on the study of the cause of equipment malfunctions on the rotor of the generator ТВВ-200-2А №9 |
2016-2018 | FGBOU VPO “National Research Institute “Moscow Power Engineering Institute” | Implementation of R & D “Development of individual elements of high-tech switchgears (KRU) with a 35 kV voltage class of various modifications with innovative types of insulating structures” |
2017 | Subsidiary PJSC “OGK-2”-
Krasnoyarskaya SDPS-2 |
Comprehensive survey of two turbine generators |
2017 | Subsidiary PJSC “OGK-2”-
Krasnoyarskaya SDPS-2 |
Thermal testing of five turbine generators |
2017 | Unipro PJSC subsidiary “Surgutskaya SDPS-2” | Modernization of rotor ТВВ-800 |
2017 | Unipro PJSC subsidiary “Surgutskaya SDPS-2” | Grooving and grinding of necks of rotor shaft ТВВ-800 |
2017 | Enel Russia PJSC | Examination by the small inductions method of the stator core of a turbine generator 390 N of Sredneuralskaya SDPS |
2017 | Avtozavodskaya CHP Ltd | Comprehensive survey of the turbine generators № 6, № 9 |
2017 | Avtozavodskaya CHP Ltd | Thermal testing of the turbine generators № 6, № 9 |
2017 | Tverskaya generation Ltd | Comprehensive survey of two turbine generators |
2017 | Subsidiary PJSC “OGK-2”-
Stavropolskaya SDPS |
Supervision of the repair of the turbine generator ТГВ-300 |
2017 | Subsidiary PJSC “OGK-2”-
Troizkaya SDPS |
Disassembly and complex diagnostics of two turbine generators ТГВ-300 st.№ 4,5 |
2017 | Tverskaya generation Ltd | Modernization of the stator winding fastening of the turbine generatorТВФ-63 |
2017 | Tverskaya generation Ltd | Supply of parts for overhaul of turbine generators ТВФ-63 and ТВС-30 |
2017 | Subsidiary PJSC “OGK-2”-
Troitskaya SDPS |
Modernization of water supply pipes to the winding of the rotor, complex survey, overhaul of the turbine generator ТГВ-500 |
2017 | Subsidiary FGC UES PJSC MPES Substation Beskudnikovo | Medium repair АСК-100 and its auxiliary systems |
2017 | Subsidiary PJSC “OGK-2” – Cherepovetskaya SDPS | Manufacture of the upper rod of the stator winding, emergency repair with the replacement of the upper rod of the turbine generator ТГВ-200 st.№ 1 |
2017 | Subsidiary PJSC “OGK-2” – Kirishskaya SDPS | Overhaul of a turbine generator ТВФ-63 st. №ТГ-2т , electric engines, current leads |
2018 | Unipro PJSC subsidiary “Berezovskaya SDPS” | Overhaul of turbine generators |
2018 | Subsidiary PJSC “Mosenergo” st.2 CHP-21 | Comprehensive survey of the turbine generator ТВФ-110-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.9 CHP-20 | Comprehensive survey of the turbine generator ТВФ-110-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.3 CHP-20 | Comprehensive survey of ТВ-2-30-2 |
2018 | Subsidiary PJSC “Mosenergo” st.7 CHP-12 | Comprehensive survey of the turbine generator ТВФ-110-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.7 CHP-26 | Comprehensive survey of the turbine generator ТВВ-320-2 |
2018 | Subsidiary PJSC “Mosenergo” st.1 CHP-25 | Comprehensive survey of the turbine generator ТВФ-63-2УЗ |
2018 | Subsidiary PJSC “Mosenergo” st.9 CHP-8 | Comprehensive survey of the turbine generator ТВФ-120 |
2018 | Subsidiary PJSC “Mosenergo” st.3 CHP-20 | Technical inspection of the turbine generator ТВ-2-30-2 |
2018 | Subsidiary PJSC “Mosenergo” st.5 CHP-9 | Comprehensive survey of the turbine generator ТЗФП-80-2УЗ |
2018 | Subsidiary PJSC “Mosenergo” st.7 CHP-20 | Technical inspection of the turbine generator ТВФ-110-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.8 CHP-21 | Technical inspection of the turbine generator ТВВ-320-2 |
2018 | Subsidiary PJSC “Mosenergo” st.9 CHP-8 | Technical inspection of the turbine generator ТВФ-120-2УЗ |
2018 | Tverskaya generation Ltd Tverskaya CHP-3 st.1 | Comprehensive survey of the turbine generator ТВФ-63-2 |
2018 | Unipro PJSC subsidiary “Surgutskaya SDPS-2” power unit № 3 st.3 | Comprehensive survey of the turbine generator ТВВ-800-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.9 CHP-11 | Technical inspection of the turbine generator ТВФ-110-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.9 CHP-12 | Comprehensive survey of the turbine generator ТВФ-110-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.7 CHP-25 | Comprehensive survey of the turbine generator ТВВ-320-2УЗ |
2018 | Subsidiary PJSC “Mosenergo” st.7 CHP-21 | Comprehensive survey of the turbine generator ТВФ-120-2УЗ |
2018 | Subsidiary PJSC “Mosenergo” st.7 CHP-26 | Technical inspection of the turbine generator ТВВ-320-2УЗ |
2018 | Subsidiary PJSC “Mosenergo” st.4 CHP-21 | Comprehensive survey of the turbine generator ТВФ-110-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.11 CHP-8 | Comprehensive survey of the turbine generator ТВФ-110-2ЕУЗ |
2018 | Subsidiary PJSC “Mosenergo” st.6 CHP-8 | Technical inspection of the turbine generator ТВФ-120-2УЗ |
2018 | Subsidiary PJSC “Mosenergo” st.4 CHP-22 | Technical inspection of the turbine generator ТВФ-63-2УЗ |
2018 | Subsidiary PJSC “Mosenergo” st.5 CHP-22 | Technical inspection of the turbine generator ТВФ-120-2УЗ |
2018 | Subsidiary PJSC “Mosenergo” st.11 CHP-8 | Technical inspection of the turbine generator ТВФ-110-2 |
2018 | Subsidiary PJSC “Mosenergo” st.6 CHP-17 | Technical inspection of the turbine generator ТВС-30 |
2018 | Subsidiary PJSC “Mosenergo” st.5 CHP-23 | Comprehensive survey of the turbine generator ТВВ-320-2 |
2018 | Subsidiary PJSC “Mosenergo” power unit 2 CHP-23 | Comprehensive diagnostic survey of the turbine generator ТЗФП-110-2МУЗ |
2018 | JSC “ Inter RAO – Power generation”“Kashirskaya SDPS” unit №1 | Comprehensive diagnostic survey of the turbine generator ТВВ-350-2УЗ |
2019 | JSC “ Inter RAO – Power generation”
«North-Western CHP named after Boris A.G» |
Survey of the turbine generator ТЗФГ-160-2МУЗ |